Pre-sales: FREE design layout, bottle, label
Sale: A to Z turnkey supply
After-sales: TNN own engineer to customer factory NO need salary
We assure machines match your requirement perfectly
70-1000ton
Variable pump or servo motor
Suitable to make PET performs, caps and other plastic products
Cap compression machine
16-24-36-48 cavities 28mm, 30mm, 38mm 10,000-50,000pcs/hour
1-6 cavities 0.1-20L 200-8000BPH 20-120mm neck
8-80 filling heads 0.1-10L 2000-36000BPH 28-30-38-46mm neck
8-80 filling heads 0.1-2.5L 1000-28000BPH PCO1881 28mm neck
8-80 filling heads 0.1-3L 1000-36000BPH 28-38mm neck
1-6 filling heads 3-5gallon 100-900BPH 55mm neck
1-2 labeling heads 0.1-20L 1000-36000BPH Label can cover bottle bottom
1-3 labeling heads 0.1-20L 1000-36000BPH Round and flat bottles
Semi and full automatic 0.1-3L 1000-36000BPH L type and liner type
Carton opener/filler/sealer 0.1-5L 1000-36000BPH Drop type and robot type
0.1-20L 8-800g 10-120mm neck PCO1810/PCO1881/400/410
10-120mm neck PCO1810/PCO1881/400/410 Color customization Sport cap available
FREE design Maximum 9 colors PVC/PET/Sticker/BOPP/Paper
0.01-0.2mm thickness Wrapping and stretch Color and printing available
If you have further questions, email or call us now!
1、What kind of machine can we supply?
Wecan supply all kinds of machien for the water bottling plant.
2、How to get a quotation for a mineral water bottling plant?
Customersneed to confirm following information first:
Bottlesize? Production capacity? Labeling type? Packaging type?
3、How long is the delivery time?
Itwill take 45-60days. Customers need to confirm bottle drawing as early aspossible.
Customersneed to provide at least 100pcs preforms and caps for machine tests.
4、How to install?
Wewill send technicians to guide customers do installations and trainings, ifcustomers require.
Dependingon different capacities of production line, the installation will take 7-30days
Beforetechnicians arrive at customer’s factory, customers should prepare water andelectricity.
5、What guarantees can we provide?
Freespare parts will be attached to each mineral water bottling plant. It isadequate for one year's production.
Wewill send new parts within 72 hours is there is any part is damaged.
6、What is the after-sale service?
Wesupply one year free after-sale service with free spare parts.
1.Technical support online service provided.
2.Technical files service provided.
3.Spare parts replacement and repair service provided.
4.Questions will be replied within 24 hours
7、What is the payment?
Wecan accept every payment T/T,D/P,D/A,LC at sight, west union, PayPal ect…
- Tel
- *Title
- *Content
ISO9001:2015 certified, founded in 1998.
Turnkey solution from A to Z.
Supplying machinery and packaging raw materials.